ST JUDES CHURCH

March 1, 2012

Scope of Works:
1. Basement excavation whilst the entire building was propped internally.
2. Underpinning existing church
3. Forming heading for drainage works
4. Forming external lightwell’s including all Mabey hire temporary works.
5. Curved/Radius staircases

Date of Completion: March 2012

Key Points:
Alterations, Refurbishment and Restoration of the existing Church comprising major alterations to the lower ground floor including lowering of structural floors, underpinning and retaining walls. Alterations to the ground floor, creation of upper floors, existing lightwells and construction of a new boiler room.

Client: Mansell Construction
Rochford Contract Value: £1,275,000.00